Loading Solar Battery Perth...
Loading Solar Battery Perth...
Perth · Osborne Park
Solar and battery guidance for Osborne Park's mixed residential streets. Central location keeps installer pricing competitive; sized storage offsets inner-city tariff exposure.
What-if simulator. Drag the timeline + sliders to see how a system would behave on a typical Osborne Park day. Weather + grid status update live when the APIs are reachable.
--°C
Loading...
--
W/m² irradiance
0 kW
Est. generation now
22.4 kWh
Avg daily yield
Household Type
Annual savings
$2,127
Monthly average
$177
Solar used at home
6,205 kWh/yr
Exported to grid
1,970 kWh/yr
Based on 5 kW solar × 5.9 sun hours × Perth derate, with a 10 kWh battery offsetting peak-rate Synergy A1 usage and exporting the surplus at DEBS peak/off-peak rates. Real savings depend on your specific tariff plan, usage pattern, and installation — an installer confirms the final quote.
Monthly Savings
~$177
Based on 5kW system, 70% self-consumption, 32c/kWh
Sun Hours
5.9 hrs/day
Annual average peak sun hours for Osborne Park
DEBS Peak Window
3pm–9pm
Export at 10c/kWh during peak, 2c/kWh off-peak
Western Power Grid: Normal
No planned outages for Osborne Park (6017). Network operating normally.
Capacity ranges only — Find My Battery matches you to the specific brand + model that fits your situation.
Backup Battery: Optional
Northern metro suburbs have good grid reliability with below-average outage frequency. Backup battery value is primarily for self-consumption optimisation and DEBS arbitrage rather than outage protection.
72
SAIDI (min/yr)
0.9
Outages/yr
80
Avg duration (min)
Pass
ERA benchmark
Common outage causes in this zone:
WA Battery Scheme: Up to $1,300 (capped at 10kWh, Synergy customers)
Federal STCs: ~$4,500 for a 13.5kWh battery (8.4 STCs/kWh × ~$39.9, Jan–Apr 2026)
Interest-free loan: Up to $10,000 available
Rebates also apply to retrofit installations on existing solar.
Programme: Synergy Battery Rewards
Events: Up to 30/year (2–6 hours each)
Payment: $0.70/kWh exported during events
Annual earnings: ~$100–180 for a 10–13kWh battery (15–25 events × 70¢/kWh)
VPP enrolment is mandatory for the WA battery rebate from May 2026.